Did some work on the 3rd jump line, K-line. Put some dirt on the landing for the table and the rainbow bridge. Also tried to patch the lip of the table top. Should be good to go in a few days when it drys.
We dug a little trench to keep people from coming of the second jump on the middle line and cutting into the big line. This is to keep maintaince hours down, people that dont have the skill to do the 1st part of k-line tend to skid over the lips doing more damage. I put cones up so hopefully nobody gets caught by suprise, tell your friends!
One last thing, someone tried to work on last jump and put sand on it. I doubt if it was anyone on this forum but if you do need to patch something find the blue clay of to the sides of the line, and don't change the lip, just touch ups please.
Thanks
-Kim
We dug a little trench to keep people from coming of the second jump on the middle line and cutting into the big line. This is to keep maintaince hours down, people that dont have the skill to do the 1st part of k-line tend to skid over the lips doing more damage. I put cones up so hopefully nobody gets caught by suprise, tell your friends!
One last thing, someone tried to work on last jump and put sand on it. I doubt if it was anyone on this forum but if you do need to patch something find the blue clay of to the sides of the line, and don't change the lip, just touch ups please.
Thanks
-Kim