September 23rd 9AM
In Dimond Canyon we'll work on the trail that BTCEB build (in '99). The trail tread has gotten pretty steep so we need to level it off some. There are also a number of large trees that need cutting and an old fence that needs to be moved off the trail tread. Overall there's a ton of work on this trail. Dress appropriately, there is poison oak in the area we will be working. BTCEB will be providing coffee and bagels for those joining us on this trail work day.
Take the exit to Park Blvd Turn onto Leimert Blvd - go 0.2 mi cross over bridge to first stop sign.Proceed left (45 degree angle ) on Leimert Blvd (NOT Leimert Place) .2 mi. Turn left at Bridgeview Dr - go to end of street - we will meet at the gate.
In Dimond Canyon we'll work on the trail that BTCEB build (in '99). The trail tread has gotten pretty steep so we need to level it off some. There are also a number of large trees that need cutting and an old fence that needs to be moved off the trail tread. Overall there's a ton of work on this trail. Dress appropriately, there is poison oak in the area we will be working. BTCEB will be providing coffee and bagels for those joining us on this trail work day.
Take the exit to Park Blvd Turn onto Leimert Blvd - go 0.2 mi cross over bridge to first stop sign.Proceed left (45 degree angle ) on Leimert Blvd (NOT Leimert Place) .2 mi. Turn left at Bridgeview Dr - go to end of street - we will meet at the gate.