Last weekend we had 2 hugely succesful days on the trail. On Saturday we had 9 people working on the trail and logged 42 hrs of building. Sunday in the pouring rain we had 7 people and did 23 hrs of work. Thanks to everyone that came out that was good times.
I will most likely be out on Friday if anyone wants to come lend a hand. Be sure to give me a shout out if you plan to come out...
The work we are doing now is mostly fine tuning. There are two sections of trail (about 60 feet each) that need organic removed and we need to build a deck for the final "grand finale" jump. I hope to get this all done on Friday. We were hitting the trail last weekend and it is super fun.
The trail is currently open to builders only as it is not complete and is too wet to be ridden...if you want to ride it...you going to need to work it.
http://evergreenmtb.org/recreation/calendar.php?event_id=8235
Check it out and give me a shout if you can get out.
Thanks
Dave
I will most likely be out on Friday if anyone wants to come lend a hand. Be sure to give me a shout out if you plan to come out...
The work we are doing now is mostly fine tuning. There are two sections of trail (about 60 feet each) that need organic removed and we need to build a deck for the final "grand finale" jump. I hope to get this all done on Friday. We were hitting the trail last weekend and it is super fun.
The trail is currently open to builders only as it is not complete and is too wet to be ridden...if you want to ride it...you going to need to work it.
http://evergreenmtb.org/recreation/calendar.php?event_id=8235
Check it out and give me a shout if you can get out.
Thanks
Dave