Quantcast

Hey Peach...

Discussion in 'The Lounge' started by johnbryanpeters, Jun 27, 2013.

  1. johnbryanpeters

    Rep/Likes:
    244 / 2,685
    Joined:
    Sep 27, 2001
    Messages:
    24,906
    Location:
    Making moss sad in New Haven, Vermont
    Pipe Specifications

    1. All pipe is to be made of a long hole, surrounded by metal or plastic centered around the hole.

    2. All pipe is to be hollow throughout the entire length - do not use holes of different length than the pipe.

    3. The I.D. (inside diameter) of all pipe must not exceed the O.D. (outside diameter) - otherwise the hole will be on the outside.

    4. All pipe is to be supplied with nothing in the hole so that water, steam or other stuff can be put inside at a later date.

    5. All pipe should be supplied without rust - this can be more readily applied at the job site. N.B. Some Vendors are now able to supply pre-rusted pipe. If available in your area, this product is recommended as it will save a lot of time on the job site.

    6. All pipe over 500 ft (153m) in length should have the words "long pipe" clearly painted on each end, so the Contractor will know it is a long pipe.

    7. Pipe over 2 miles (3.2 km) in length must have the words "very long pipe" painted in the middle, so the Contractor will not have to walk the entire length of the pipe to determine whether or not it is a long pipe or a very long pipe.

    8. All pipe over 6" (152 mm) in diameter must have the words "large pipe" painted on it, so the Contractor will not mistake it for small pipe.

    9. Flanges must be used on all pipe. Flanges must have holes for bolts quite separate from the big hole in the middle.

    10. When ordering 90 degrees, 45 degrees or 30 degrees elbow, be sure to specify right hand or left hand; otherwise you will end up going the wrong way.

    11. Be sure to specify to your vendor whether you want level, uphill or downhill pipe. If you use downhill pipe for going uphill, the water will flow the wrong way.

    12. All couplings should have either right hand or left hand thread, but do not mix the threads - otherwise, as the coupling is being screwed on one pipe, it is unscrewed from the other.
     

    Please register to disable this ad.

  2. rockofullr

    rockofullr confused

    Rep/Likes:
    115 / 836
    Joined:
    Jun 11, 2009
    Messages:
    7,307
    Location:
    East Bay, Cali
    Must spread rep.

    I design pipelines, will be sharing this with coworkers.
     
  3. jonKranked

    jonKranked Press Button, Receive Stupid

    Rep/Likes:
    383 / 3,703
    Joined:
    Nov 10, 2005
    Messages:
    54,362
    Location:
    media blackout
    looks like the kind of spec you'd have to write for manufacturing in SE asia.

    no really.
     
  4. Westy

    Westy the teste

    Rep/Likes:
    443 / 2,835
    Joined:
    Nov 22, 2002
    Messages:
    36,153
    Location:
    Sleazattle
    One of the factories at work had a problem when the first started up. Several of the pipes had the ID spec'd larger than the OD. Easily sorted out when building the plant but the computer model assumed zero flow resistance in the pipes due to the infinite cross section, the design didn't work so well in application.
     
    #4 -   Jun 27, 2013
    Last edited: Jun 27, 2013