lmao~ i gotta move all that dirt~ just got it dumped yesterday~ i'm trying to get my jump cut good~ i'm not even gonna have it a table top~ just gettin my launch jump cut good~ then cuttin the rest off and making the landing~
yup its my grass~ its a pretty awesome spot~ i'll take better pics once i get more done~ i have a long blacktop road i can get whatever run i want on it~ and its right at the beginning of my yard~ i'm going to make a straight rhythm trail straight down my yard towards the pool if you look straight at the jump~ you can see a smaller double by my pool~ it will be a while before i get the full trail done because i'm building it by myself~ but i'll get it done~ any tips i'm very thankful for~ ive tried to read up and study up trail building as much as possible~ so wish me luck~ thanx
Difficult to tell how tall it is from the pics. If it is 3 or 4 ft or taller, I'd carve it out a little more in the center of the transition with the top of the lip vertical or very close to it. Similar to a quarter pipe.
Remove all of the other dirt from the sides. Leave it only as wide as the smooth lip area you've got going. OR make it into a hip. Judging by the last pic, you've got enough area that you could add a second lip to the left of your existing lip. Carve it at about a 45 degree angle from the existing lip. More options = more fun.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.