So today was the first work day for the up and coming DH race in Oct. We had a great turn out. About 12+. A BIG THANKS to all that attended. We got the Top part of the trail done. It now has to very large Berms that flow down and crosses over the old first strait down to the Tree Root Right hand turn. We added in a few Water Bars as well so you can jump parts of the trail. Understand they were put in at all the right places to pull water off the trail, but will add a lot of fun factor to the trail. We also got some work done to the upper rocky part of the trail and mover the Large Rock that most riders hit their bikes on to a small rock drop. Most of us have been using it as a Rock Berm in the past. Thanks to Matt Griffin for coming up with the idea to make it a small drop instead of a berm. It is also placed well to help the trail drain water well. I am sure Brad will have Pictures up soon.....
We are talking about bringing back the Dirty Thursday Work Days. This means every Thursday someone should be out there working on the trail from about 5 pm till. Please stay tuned to this Tread to make sure someone will be out there to Lead that day.
As for the next Work Day we are looking at Saturday the 29th. We will be meeting at 9AM again at Shelter 5&6 and work till we stop.
Please feel free to PM me if you have any questions.
Thanks again,
Cecil
We are talking about bringing back the Dirty Thursday Work Days. This means every Thursday someone should be out there working on the trail from about 5 pm till. Please stay tuned to this Tread to make sure someone will be out there to Lead that day.
As for the next Work Day we are looking at Saturday the 29th. We will be meeting at 9AM again at Shelter 5&6 and work till we stop.
Please feel free to PM me if you have any questions.
Thanks again,
Cecil
Last edited: