The all women's mountain bike team, the Speedy Beavers, are hosting a fun ride to encourage more women to get out there and RIDE! This ride is for all skills levels, we will break into groups accordingly. The ride will be held at the Pilchuck Tree Farm, off of 300th Street in Stanwood on June 21, 2006 at 6:00 pm.
This is one of our very favorite trails and you have to take advantage of them in the summertime, because the trails are closed all winter (Nov to May)! There are lots of cool flowy singletrack trails leading up the hill and a well maintained logging/fire road if you prefer. For a relatively fast moving group, the uphill will take an hour or less. We will head up to the monument by the Pilchuck Glass School to see the stellar view of the islands and Skagit Valley. We will stop there for our quick Summer Solstice celebration. Then we will head down, down, down the hill on some super fun, Super D style trails. There are a couple small kickers if you feel the desire, but it is all doable single track for everyone.
Directions to Pilchuck Tree Farm:
From Everett, go North On I-5 to Exit 215 (300th Street). Turn right onto 300th Street and go 6 miles to the end. Park on the side of the street.
From Mount Vernon, go South On I-5 to Exit 215 (300th Street). Turn left onto 300th Street and go 6 miles to the end. Park on the side of the street.
We will meet at the parking area at 6:00 pm.
Please RSVP to:
info@speedybeaverracing.com
This way we will know if we should wait for any late comers. When you RSVP, we can give you some contact names, numbers, and help arrange rides, if necessary.
For more information, please refer to our website:
http://www.speedybeaverracing.com/FunRides/FunRides.htm
THANKS! Hope to see you there!
This is one of our very favorite trails and you have to take advantage of them in the summertime, because the trails are closed all winter (Nov to May)! There are lots of cool flowy singletrack trails leading up the hill and a well maintained logging/fire road if you prefer. For a relatively fast moving group, the uphill will take an hour or less. We will head up to the monument by the Pilchuck Glass School to see the stellar view of the islands and Skagit Valley. We will stop there for our quick Summer Solstice celebration. Then we will head down, down, down the hill on some super fun, Super D style trails. There are a couple small kickers if you feel the desire, but it is all doable single track for everyone.
Directions to Pilchuck Tree Farm:
From Everett, go North On I-5 to Exit 215 (300th Street). Turn right onto 300th Street and go 6 miles to the end. Park on the side of the street.
From Mount Vernon, go South On I-5 to Exit 215 (300th Street). Turn left onto 300th Street and go 6 miles to the end. Park on the side of the street.
We will meet at the parking area at 6:00 pm.
Please RSVP to:
info@speedybeaverracing.com
This way we will know if we should wait for any late comers. When you RSVP, we can give you some contact names, numbers, and help arrange rides, if necessary.
For more information, please refer to our website:
http://www.speedybeaverracing.com/FunRides/FunRides.htm
THANKS! Hope to see you there!