Quantcast

Trail Work or should I say Rock Work

splat

Nam I am
Was a trial day today , a beutiful day and our Numbers were a little low. I can understand that too, one of the first really awesome weekends, and I too would have rather have been riding , but so be it.

we had about 15 people today , and off to work we went.

a down tree in the way.



Foret moving it , Chainsaw time !!



we had 2 crews going/ one up top working a roller/ a Go around , and the Berm.

the top part. the roller.



in the Berm



and the lower crew making a berm before a step up.



Dirt , we always Need Dirt!!!



the top berm the end needed rework.



The lower crew placed all there rocks fr the berm andthe crew Dirting was busy at work, so the rock workers moved to a large Rock Berm/wall Lots of rock work here.



meanwhile up on the top berm moving rock also




Lunch Break!!!




BAck on the lower berm taking some shape.



Mean while the lower berm is looking just about doen.



ZAch has to test his work



and Peter decided to try it too!



now teh top berm is getting dirt. note the drain at the bottom



Closer look at the drain. we dug teh pit right unter the berm wall, filled it with small stones, the coverit in a silt cloth , and added more rock on top of that ,



adding dirt to the Roll out.



Tamping out the top berm.



at this point I needed to leave.

However . a little later , we would have our chapter meeting, at a local watering hole. over half the people in attendance were also helping dig the trail.