I woke up at quarter of five with Hilarie snoring loudly. Tomorrow morning rain theoretically starts, continuing through Thursday morning. I hope it does so, we need it a lot. Friday V. arrives for the weekend.
Nah she’s just trying to Hanz und Franz your legs.Mornin!
Wife wanted to go hike up a mountain, so we are going to hike up a mountain. So thats pretty neato. Though she has burdened me with the backpack and water to try and slow me down.
Go for a mountain bike ride.Sitting on my ass right on coffee cup #2. I can't decide if I want to ride, run, or sit on my ass and do nothing all day. Ahhh, the joys of having no responsibilities and nothing to tend to on this Sunday.
They still play in the AFC East,Hey how are the patriots going to win this year if they can't plant somebody in the stands to watch the opposite teams practice or read lips with masks on?
Did not ride in to work because it was supposed to rain. Not a cloud in the sky of course, though there is enough smoke to make up for it, so either way maybe for the best that I did not.
It will be three months, next week.
A GG ad popped up on another website. The tagline was "what are you waiting for?"
About 2 months, right?
Sorry but that's ridiculous.It will be three months, next week.
I think most bike companies are struggling to get the components required from 3rd parties for their full builds. I don't think GG is alone in suddenly having long lead times now.Sorry but that's ridiculous.
I'm trying to be understanding, what with teh'Rona and all. But I'll admit I'm growing frustrated. When I ordered July 6, lag time was 5-7 weeks. A month later I got an e-mail saying zikbolaids broke out on the floor, my order # was 5 weeks out, possibly another 2-4 weeks due to lag time at Industry 9, depending on color. A month ago tomorrow, I received an email saying bike was in assembly. I get shit is weird now, but 3 months is kind of stretching my admittedly limited patience.Sorry but that's ridiculous.
Sounds like they're struggling for inventory on something then, try giving them a call to see what they're missing.I'm trying to be understanding, what with teh'Rona and all. But I'll admit I'm growing frustrated. When I ordered July 6, lag time was 5-7 weeks. A month later I got an e-mail saying zikbolaids broke out on the floor, my order # was 5 weeks out, possibly another 2-4 weeks due to lag time at Industry 9, depending on color. A month ago tomorrow, I received an email saying bike was in assembly. I get shit is weird now, but 3 months is kind of stretching my admittedly limited patience.
Perhaps you ordered some weird components, but several others here ordered bikes after you did and already received their bikes.I'm trying to be understanding, what with teh'Rona and all. But I'll admit I'm growing frustrated. When I ordered July 6, lag time was 5-7 weeks. A month later I got an e-mail saying zikbolaids broke out on the floor, my order # was 5 weeks out, possibly another 2-4 weeks due to lag time at Industry 9, depending on color. A month ago tomorrow, I received an email saying bike was in assembly. I get shit is weird now, but 3 months is kind of stretching my admittedly limited patience.
If I had to guess, it's something from I9. I've been trying to get red spokes for my old wheels, and that shit is like trying to find Sasquatch.Sounds like they're struggling for inventory on something then, try giving them a call to see what they're missing.
I ordered standard race build, with orange bits. The only thing I asked for that might be unusual is for the brakes to be set up motorcycle style. I doubt if that effects much.Perhaps you ordered some weird components, but several others here ordered bikes after you did and already received their bikes.
Foot controlled rear brake? That is weird.I ordered standard race build, with orange bits. The only thing I asked for that might be unusual is for the brakes to be set up motorcycle style. I doubt if that effects much.
probably trying to figure out how to fit a Harley into a bike boxI ordered standard race build, with orange bits. The only thing I asked for that might be unusual is for the brakes to be set up motorcycle style. I doubt if that effects much.
Have you heard of a company called Trickstuff?Sorry but that's ridiculous.
Supply chain for the bike industry is fubar right now.I'm trying to be understanding, what with teh'Rona and all. But I'll admit I'm growing frustrated. When I ordered July 6, lag time was 5-7 weeks. A month later I got an e-mail saying zikbolaids broke out on the floor, my order # was 5 weeks out, possibly another 2-4 weeks due to lag time at Industry 9, depending on color. A month ago tomorrow, I received an email saying bike was in assembly. I get shit is weird now, but 3 months is kind of stretching my admittedly limited patience.
Obvious solution is obvious.back from camping. ready for a beer and a shower.
If you need a beer after camping you need to learn to camp betterback from camping. ready for a beer and a shower.
Charcuterie (that's meat and cheese for @Westy) and wine on the deck here.Beer and charcuterie