Quantcast

Upstate SORBA Trail Work Day Scheduled for this Saturday

eccorp

Chimp
May 18, 2010
56
0
Our February Date was cancelled due to Snow.
We will be holding a trail work day at Pleasant Ridge this Saturday from 9am-2pm Rain or Shine.

We will be working on back slope, clearing debris from the low side of the trail, clearing the tread.

We need your help to get this opened by April. We are roughly one mile away from connecting the loop.As long as the weather holds out you should be able to ride afterwards.

Come out and check out the new trail system be built in the Upstate.
 
Last edited: