Update: 6/17/09...
Recently the Tuesday Night Trailcrew has been working on a stunt started a few years ago dubbed 'Frankie goes to Hollywood'. It's a large rock feature with 3 lines into a large transition. Until now, only the leftmost line, up and over the rock was open but we finished the other 2 and tabled and expanded the tranny. We'll probably tweak it a bit and maybe reroute the trail after it depending on how it rides......here are some pics.
This what it looked like after building it the first time. A lot of feedback was that it was too hard to get up on and scrubbed too much speed.
So we added a ton of rock....
And built a monstrous onramp to accommodate multiple lines (and skill levels )...
Adding dirt....lot's of dirt.....
And it's ready to ride....
Tonight's test pilot Berkshire Rider...taking the middle, 'wallride' line....
As always, thanks to all the volunteers for their time and for doing all the heavy lifting.
The VLMC
Recently the Tuesday Night Trailcrew has been working on a stunt started a few years ago dubbed 'Frankie goes to Hollywood'. It's a large rock feature with 3 lines into a large transition. Until now, only the leftmost line, up and over the rock was open but we finished the other 2 and tabled and expanded the tranny. We'll probably tweak it a bit and maybe reroute the trail after it depending on how it rides......here are some pics.
This what it looked like after building it the first time. A lot of feedback was that it was too hard to get up on and scrubbed too much speed.
So we added a ton of rock....
And built a monstrous onramp to accommodate multiple lines (and skill levels )...
Adding dirt....lot's of dirt.....
And it's ready to ride....
Tonight's test pilot Berkshire Rider...taking the middle, 'wallride' line....
As always, thanks to all the volunteers for their time and for doing all the heavy lifting.
The VLMC
Last edited: