Quantcast

Duthie Bootcamp Trail Closure starting 4/9

mwestra2

Monkey
Dec 4, 2007
130
0
Flat + deciduous + clay + lotsa rain + never-ending pounding of tires = mucho repairs needed on Bootcamp.

Sorry folks, I was hoping we wouldn't have to do it, but we're going to have to close a large section of Bootcamp to give it some dry out time and some rest before the May 22nd Grand Opening. The flowy downhill ending from the WLLR (world's longest log ride) to the clearing will still be open.



Check the Duthie trail page (http://evergreenmtb.org/duthie) before you head out there to get the latest status on trail closures. We'll also post here and on the other forums and put up signs in the park. And don't forget -- the park is under construction until May 22.

Or, check out the MTBR WA forum for more info.

Note: freeride trail closures are up to the builder's discretion and can be closed at any time.

We need your help. Sign up for a work party (http://evergreenmtb.org/recreation/calendar_view.php)! If you know what you are doing, lead a work party!! Shoot Kevin or me an email. kevin@ or mwestra@ evergreenmtb.org. Thanks!