Trail builders and bosses - any tips on building jumps in a way that minimizes unnecessary maintenance?
I know to build good drainage, but what other things do you think about when putting a line together that help keep work time down (aside from the required water, sweeping, and patching)? Our spot is publicly known, so it gets a lot of traffic, and a very wide variety of skill levels come to ride.
MT - I bet you got a lot of hacks (such as myself a few years ago) at lake arbor. Did you do anything special as a result? For example - after watching lots of people bail out of one the right line (below) only to ride across the left lip and eff it up, I dug a trench between the two (they used to be connected), making it much harder for them to do so...
I know to build good drainage, but what other things do you think about when putting a line together that help keep work time down (aside from the required water, sweeping, and patching)? Our spot is publicly known, so it gets a lot of traffic, and a very wide variety of skill levels come to ride.
MT - I bet you got a lot of hacks (such as myself a few years ago) at lake arbor. Did you do anything special as a result? For example - after watching lots of people bail out of one the right line (below) only to ride across the left lip and eff it up, I dug a trench between the two (they used to be connected), making it much harder for them to do so...
Last edited: