Wide awake. Wifey accidentally turned off the AC this afternoon and the upstairs of the house is sweltering. Too hot to sleep, so I've spent the last hour researching how to remove a tile backsplash and granite tile counters. We're getting ours replaced and the labor for those steps and disconnecting the plumbing is almost $2k. I can figure that work out on my own.
Going to be a busy weekend. Long run tomorrow, Wifey needs to work a bit, I need to finish installing the garbage disposal, SolarCity coming by in the afternoon, and a kid playdate in the morning. Sunday is my fit for the tri bike, so I'll be there for 3 hours. I need to get in a 30 mile ride, change the oil in both cars, replace 5 sprinkler heads, and my basic garden maintenance. Writing is all down makes me realize that I have way too much to do this weekend.
Going to be a busy weekend. Long run tomorrow, Wifey needs to work a bit, I need to finish installing the garbage disposal, SolarCity coming by in the afternoon, and a kid playdate in the morning. Sunday is my fit for the tri bike, so I'll be there for 3 hours. I need to get in a 30 mile ride, change the oil in both cars, replace 5 sprinkler heads, and my basic garden maintenance. Writing is all down makes me realize that I have way too much to do this weekend.