The Clemson Freeride Club will be having one of the last workdays on April 7th starting at 10am. All major projects are completed but the trail needs quite a bit of grooming and tweaking. The biggest goal for the day will be to add a dirt transtion onto and off of the wallride and dirt around the entire base. This cannot be completed until after the Red Bull painter has come out and Completed the Mural, which will be sometime this week. A couple of doubles still need to be filled in, the rock garden needs to be brought back up the hill, some berms need grooming, and almost everything could use a load or two of fresh dirt.
We will have a grill out there with hot dogs and such. I will also bring lots of Red Bull to engergize our work. Bring your bike as we will most likely shuttle the course after working.
Any questions post them here or PM myself or Jon(Ridiculous)
We will have a grill out there with hot dogs and such. I will also bring lots of Red Bull to engergize our work. Bring your bike as we will most likely shuttle the course after working.
Any questions post them here or PM myself or Jon(Ridiculous)