So when my coworkers ask, "what did you do this weekend?" if I tried to tell them about this they just wouldn't understand. I had a little freeride play area set up in my front yard that was a combination of fallen trees and decking. it's been there for about 4 years now and mother nature has taken its toll so I replaced it with all man made structures. The bulk of the structure i was able to build w/construction scrap I'd scavenged from a few different build sites (hence the lack of 'presentation' in the build) and the rest i purchased new. In an effort to make it as stout as possible the column supports are built of 2x10 and 2x6 respectively with 5/16"x4" carriage bolts, opposing diagonal cross members, and an entire bag of 80lb quick crete. The steeper section is angled at 15 degrees and peaks at about 5'. it's been almost 24hrs now so the cure time is almost up. I'll coat it with 2 applications of exterior paint adding sand to each coat for grip. i hope to session it by Monday.
[/IMG]
[/IMG]
[/IMG]
[/IMG]
[/IMG]
[/IMG]
[/IMG]
[/IMG]
Last edited: