This will be my new SS 29er that will replace the jabberwocky, the cranks should be in monday night and the build will begin.
First step was to treat the seat tube and head tube with some frame saver as the other tubes are sealed.
second step:grease the phil ebb with extra lube to keep it quiet.
Third:just buld it already
First step was to treat the seat tube and head tube with some frame saver as the other tubes are sealed.
second step:grease the phil ebb with extra lube to keep it quiet.
Third:just buld it already