This took about 3 weeks to build all from scratch and pallets. I cut trees down for the framing underneath and its solid as a rock. I will probably have to change it next year because its Alder and they rot pretty bad. Forgot a picture of the landing.
http://www.pinkbike.com/photo/3736016/
Run up to about a 15-20ft step-down hip right
http://www.pinkbike.com/photo/3736019/
The Step-down hip right
http://www.pinkbike.com/photo/3735972/
Alright look at the gap
http://www.pinkbike.com/photo/3736017/
The Landing
http://www.pinkbike.com/photo/3736018/
http://www.pinkbike.com/photo/3736016/
Run up to about a 15-20ft step-down hip right
http://www.pinkbike.com/photo/3736019/
The Step-down hip right
http://www.pinkbike.com/photo/3735972/
Alright look at the gap
http://www.pinkbike.com/photo/3736017/
The Landing
http://www.pinkbike.com/photo/3736018/
Last edited: