im doing a sh1tload of riding/building on my dirtjumps on this sunday(may 19) if anyone wants to ride, or help, reply or send an email, snobrdr777@hotmail.com
lineup now, soon to be greatly expanded(as in this weekend), is 6ft roll in(made of wood, not dirt) 5 ft double, approx 8 foot gap now, which will be lengthened to about 12 this weekend, then a split off to the left in the works, straight is a 4 foot double, 10 foot or so gap, then another smaller double, like 3 feet, which will also be enlarged this weekend, with a small gap, then i have a huge pile of dirt which can be built into jumps. oh yea, i have this tiny jump for beginners too, its like 1.5 feet tall and like 3 feet long, its a joke
lineup now, soon to be greatly expanded(as in this weekend), is 6ft roll in(made of wood, not dirt) 5 ft double, approx 8 foot gap now, which will be lengthened to about 12 this weekend, then a split off to the left in the works, straight is a 4 foot double, 10 foot or so gap, then another smaller double, like 3 feet, which will also be enlarged this weekend, with a small gap, then i have a huge pile of dirt which can be built into jumps. oh yea, i have this tiny jump for beginners too, its like 1.5 feet tall and like 3 feet long, its a joke